Time2meet Logo Watch this Site for Future Meetings - This Meeting is Closed












Jeff Basiaga
jeff.basiaga@stantec.com
813-541-5758



Friday, May 22, 2009 at


This meeting is closed.

Meeting Description
Date: Friday, May 22, 2009

Time: Meeting: 11:30am-1:00pm (includes Lunch)

Cost: $10 IEEE Members, $15 Non-Members, $5 Students

Speaker: Eric Senkowicz, Manager of Operations, FRCC

Location: Florida Reliability Coordinating Committee (FRCC)
1408 N. Westshore Blvd., Suite 1002, Tampa, FL, 33618

RSVP: Online at: http://time2meet.com/fwcs-pes1/index.html
Space limited to the first 45 registrants!!!

Questions: Donna Howard at 813-207-7966 or DHoward@FRCC.com


Additional Information
On Tuesday, February 26, 2008, the FRCC Bulk Electric System experienced a system disturbance that was initiated by delayed clearing of a three-phase transmission system fault that developed on a 138 kV switch located at one of FPL’s Miami area substations. Isolation of the fault led to the following event:

- The opening of 22 transmission lines
 6 - 230 kV lines
 15 - 138 kV lines
 1 - 69 kV line
- The disconnection of approximately 1350 MW of customer load in the vicinity of the fault
- The loss of approximately 2500 MW of generation near the fault location
- The additional loss of approximately 2300 MW of distribution-level customers dispersed
across the southern part of Florida by the region’s automatic underfrequency load shedding program
- The loss of an additional 1800 MW of generation across the Region

SPEAKER BIOGRAPHICAL INFORMATION
Eric Senkowicz is the FRCC Manger of Operations. His primary responsibilities include facilitator and liaison to various operating committees and reliability groups within the FRCC structure. Eric is also active in representing FRCC reliability within the NERC standards development process and has been active on various drafting teams and working groups.
Eric has been working in the utility industry for over 14 years. His experience includes nuclear plant design engineering, systems engineer, component failure analysis specialist and protective relaying installation and maintenance. Eric’s experience also includes five years in grid operations with various responsibilities including load forecasting, system dispatch, transmission operations, operations planning and system operator for the FPL system (≈ 20,000 MW peak).
Prior to joining the FRCC staff, Eric worked for FPL, the FRCC RC Agent, and spent three years as an on-shift FRCC Regional Reliability Coordinator based out of Miami, Florida.
Eric holds a degree in Electrical Engineering and is a NERC Certified System Operator, Reliability area. Eric is also a registered Professional Engineer in the State of Florida.

Meeting Location
FRCC - Suite 1002
1408 N. Westshore Blvd., ,
Tampa

[ Mapquest]



This reservation service is provided by Time2Meet.com.